COMET- Enfield (Design and Build)
COMET Enfield was one of their larger-scale projects; a total of 1,085 square metres in area trimmed with 32 metres of stainless steel and glass balustrading. This mezzanine floor had as a design requirement the minimum number of columns in the retail area, using 9m spans for a less cluttered effect to the environs below. The project was fully installed in 13 days (10 days for the mezzanine floor, 3 days balustrading); all work finished to the highest of standards by our fully trained installation team.

|
COMET- Enfield The Finished Project in use.

|
|
|
|